Types
0Instelling
27Publicatiejaar
6Producttype
23Bestandstype
9Taal
5Publicaties met bestand/URL
2Onderzoeksthema's
13Looptijd
0Projectstatus
3Research suggests that construction clients, as building owner-occupier, are struggling to implement smart maintenance. This thesis assumes that this is due to a failure to fully understand the institutional complexities of smart maintenance. Hence, the aim of this thesis was to improve our understanding of these complexities and to develop theoretical and practical knowledge on the professionalization of construction clients in commissioning smart maintenance through stewardship. Stewardship theory portrays managers and employees as collectivists, pro-organizational and trustworthy, and can be used for designing collaborations based on intrinsic motivation and trust.
A first insight from this thesis relates to how institutional complexity in smart maintenance management (SMM) can be understood (study 1). Institutional complexity is defined as the combined effect of 15 interorganizational and intraorganizational tensions that are active simultaneously.
A second insight from this thesis relates to the capabilities that construction clients need to address the institutional complexities of SMM and connect various institutional fields (study 2). Using data collected from four cases involving two construction clients, a framework with eight maturity dimensions, involving 23 sub-dimensions, has been developed and validated.
The third insight from this thesis relates to the role of the purchasing function in commissioning smart maintenance and emerged from considering the service triad concept (study 3). The findings indicate that the service triad concept fails to provide sufficient detail to adequately describe the construction client’s role in SMM. Hence, the service triad is extended to a service hexad.
Our fourth insight relates to intrapreneurial stewardship (study 4). A process model for change implementation through stewardship interventions has been developed and then evaluated in a case study. The process model combines constructs from stewardship theory with intrapreneurship concepts and describes how employees can be coached by leaders during periods of organizational change.
Together, the insights from the four studies are synthesized in a framework for client-led innovation in SMM and describe how construction clients can increase SMM maturity in institutionally complex environments through stewardship.
ONDERZOEK INTERN, AFSTUDEREN EXTERN
This paper aims to develop a tool for measuring the clients’ maturity in smart maintenance supply networks. The assessment tool is developed and validated for corporate facilities management organizations using case studies and expert consultation. Based on application of the assessment tool in five cases, conclusions are presented about the levels of maturity found and the strengths and limitations of the assessment tool itself. Also, implications for further research are proposed.
PAPER
This paper aims to develop a tool for measuring the clients’ maturity in smart maintenance supply networks. The assessment tool is developed and validated for corporate facilities management organizations using case studies and expert consultation. Based on application of the assessment tool in five cases, conclusions are presented about the levels of maturity found and the strengths and limitations of the assessment tool itself. Also, implications for further research are proposed.
PAPER
While smart maintenance is gaining popularity in professional engineering and construction management practice, little is known about the dimensions of its maturity. It is assumed that the complex networked environment of maintenance and the rise of data-driven methodologies require a different perspective on maintenance. This paper identifies maturity dimensions for smart maintenance of constructed assets that can be measured. A research design based on two opposite cases is used and data from multiple sources is collected in four embedded case studies in corporate facility management organizations. Through coding data in several cross-case analyses, a maturity framework is designed that is validated through expert consultation. The proposed smart maintenance maturity framework includes technological dimensions (e.g., tracking and tracing) as well as behavioral dimensions (e.g., culture). It presents a new and encompassing theoretical perspective on client leadership in digital construction, integrating innovation in both construction and maintenance supply networks.
ARTIKEL
This paper analyzes the institutional context of maintenance purchasing in higher education. It aims to provide insights into the institutional complexities of smart maintenance purchasing in higher education institutes. In a case study, six external institutional fields and two internal institutional logics are identified. They create two types of institutional complexities that impede innovation if not treated correctly. Three ways are discussed to deal with those institutional complexities, 1) negotiating institutional field boundaries, 2) creating new institutional logics and practices, and 3) implementing institutional changes.
PAPER
This study provides insights into the requirements for client-led strategic renewal of Smart Maintenance Management (SMM) in the construction industry by analyzing its institutional context. A single case study is conducted within a public-sector facility management (FM) organization that operates as a shared service center for two Dutch universities, managing over 60 buildings. All maintenance activities are outsourced to external contractors, making the organization a suitable setting for exploring institutional complexities in SMM implementation. Data were collected through 28 semi-structured interviews and analysis of contracts, internal documents, and secondary sources. The study identifies institutional complexities arising from fragmented supplier networks and conflicting internal corporate logics within the client organization. Three key requirements for successful client-led strategic renewal in SMM are identified: (1) developing client capabilities to manage boundaries between distinct supplier networks (institutional fields), (2) creating new internal practices and decision-making logics to better align with those external environments, and (3) exercising change leadership to reconcile conflicting interests and implement institutional change. These findings contribute to construction management literature by shifting attention toward the internal challenges faced by clients during digital transformation of maintenance. While the results are drawn from a single public-sector case, the institutional framework and identified requirements offer transferable insights for other construction clients navigating similar complexities.
ARTIKEL
The full potential of predictive maintenance has not yet been utilised. Current solutions focus on individual steps of the predictive maintenance cycle and only work for very specific settings. The overarching challenge of predictive maintenance is to leverage these individual building blocks to obtain a framework that supports optimal maintenance and asset management. The PrimaVera project has identified four obstacles to tackle in order to utilise predictive maintenance at its full potential: lack of orchestration and automation of the predictive maintenance workflow, inaccurate or incomplete data and the role of human and organisational factors in data-driven decision support tools. Furthermore, an intuitive generic applicable predictive maintenance process model is presented in this paper to provide a structured way of deploying predictive maintenance solutions https://doi.org/10.3390/app10238348 LinkedIn: https://www.linkedin.com/in/john-bolte-0856134/
ARTIKEL
The full potential of predictive maintenance has not yet been utilised. Current solutions focus on individual steps of the predictive maintenance cycle and only work for very specific settings. The overarching challenge of predictive maintenance is to leverage these individual building blocks to obtain a framework that supports optimal maintenance and asset management. The PrimaVera project has identified four obstacles to tackle in order to utilise predictive maintenance at its full potential: lack of orchestration and automation of the predictive maintenance workflow, inaccurate or incomplete data and the role of human and organisational factors in data-driven decision support tools. Furthermore, an intuitive generic applicable predictive maintenance process model is presented in this paper to provide a structured way of deploying predictive maintenance solutions.
ARTIKEL
This research investigates growth inhibitors for smart services driven by condition-based maintenance (CBM). Despite the fast rise of Industry 4.0 technologies, such as smart sensoring, internet of things, and machine learning (ML), smart services have failed to keep pace. Combined, these technologies enable CBM to achieve the lean goal of high reliability and low waste for industrial equipment. Equipment located at customers throughout the world can be monitored and maintained by manufacturers and service providers, but so far industry uptake has been slow. The contributions of this study are twofold. First, it uncovers industry settings that impede the use of equipment failure data needed to train ML algorithms to predict failures and use these predictions to trigger maintenance. These empirical settings, drawn from four global machine equipment manufacturers, include either under- or over-maintenance (i.e., either too much or too little periodic maintenance). Second, formal analysis of a system dynamics model based on these empirical settings reveals a sweet spot of industry settings in which such inhibitors are absent. Companies that fall outside this sweet spot need to follow specific transition paths to reach it. This research discusses these paths, from both a research and practice perspective.
ARTIKEL