To reduce greenhouse gas emissions, countries around the world are pursuing electrification policies. In residential areas, electrification will increase electricity supply and demand, which is expected to increase grid congestion at a faster rate than grids can be reinforced. Battery energy storage (BES) has the potential to reduce grid congestion and defer grid reinforcement, thus supporting the energy transition. But, BES could equally exacerbate grid congestion. This leads to the question: What are the trade-offs between different battery control strategies, considering battery performance and battery grid impacts? This paper addresses this question using the battery energy storage evaluation method (BESEM), which interlinks a BES model with an electricity grid model to simulate the interactions between these two systems. In this paper, the BESEM is applied to a case study, wherein the relative effects of different BES control strategies are compared. The results from this case study indicate that batteries can reduce grid congestion if they are passively controlled (i.e., constraining battery power) or actively controlled (i.e., overriding normal battery operations). Using batteries to reduce congestion was found to reduce the primary benefits provided by the batteries to the battery owners, but could increase secondary benefits. Further, passive battery controls were found to be nearly as effective as active battery controls at reducing grid congestion in certain situations. These findings indicate that the trade-offs between different battery control strategies are not always obvious, and should be evaluated using a method like the BESEM.
DOCUMENT
The transition from diesel-driven urban freight transport towards more electric urban freight transport turns out to be challenging in practice. A major concern for transport operators is how to find a reliable charging strategy for a larger electric vehicle fleet that provides flexibility based on different daily mission profiles within that fleet, while also minimizing costs. This contribution assesses the trade-off between a large battery pack and opportunity charging with regard to costs and operational constraints. Based on a case study with 39 electric freight vehicles that have been used by a parcel delivery company and a courier company in daily operations for over a year, various scenarios have been analyzed by means of a TCO analysis. Although a large battery allows for more flexibility in planning, opportunity charging can provide a feasible alternative, especially in the case of varying mission profiles. Additional personnel costs during opportunity charging can be avoided as much as possible by a well-integrated charging strategy, which can be realized by a reservation system that minimizes the risk of occupied charging stations and a dense network of charging stations.
MULTIFILE
Electrification of residential areas is increasingly common. Major areas of development include rooftop solar panels, electric vehicles and heat pumps. However, existing grid components may have insufficient network capacity to accommodate the resulting electricity flows. Battery energy storage (BES) can be used to prevent transformer overloading resulting from electrification. Ideally, BES should be sized and placed such that it can prevent overloading with a minimum amount of storage capacity, but it is unclear how load characteristics affect BES capacity requirements. This study investigated how load simultaneity affects the minimum BES capacity required to prevent transformer overloading, comparing a central with a distributed BES layout. It was found that as simultaneity increases, distributed storage requires relatively less capacity than central storage. This is likely due to the reduced ability of central BES to share capacity between connections as simultaneity increases, and the ability of distributed BES to better reduce transportation losses.
DOCUMENT
Electrification of residential areas is increasingly common. Major areas of development include promoting rooftop solar panels, electric vehicles and heat pumps. However, existing grid components may have insufficient capacity to support the resulting electricity flows. Battery energy storage (BES) can be used to prevent transformer overloading resulting from electrification. Ideally, BES should be sized and placed such that it can prevent overloading with a minimum amount of storage capacity, but it is unclear how load characteristics affect BES capacity requirements. This study investigated how load simultaneity affects the minimum BES capacity required to prevent transformer overloading, comparing a central with a decentral BES configuration. It was found that as simultaneity increases, decentral storage requires relatively less capacity than central storage. This is likely due to the reduced ability of central BES to share capacity between connections with higher simultaneity, and the ability of decentral BES to better reduce transportation losses.
DOCUMENT
Decarbonisation of urban logistics is a pressing issue. About one third of the freight-related CO 2 emissions in the Netherlands relates to urban logistics, consisting of both vans and trucks. Although electrification is a feasible solution, delivery models that not only focus on reducing the carbon footprint, but also the spatial footprint are important. A one-to-one replacement of diesel vehicles with electric vehicles does not reduce urban logistics' spatial footprint in densifying cities nor the delivery vans' perceived nuisance. This paper examines the impact of alternative delivery models in the parcel- and home delivery segment in four future scenarios on CO 2 emissions, vehicle kilometres and number and type of vehicles used (2030). Analyses are based on data from three companies in a large metropolitan region in the Netherlands. The results show the impact of vehicles fleets electrification, transhipment in consolidation points and a network of pickup points. This study illustrates that developing alternative last mile networks can result in a decrease in vehicle (van) movements, and with that a serious decrease in emissions. The implications of the results on the carbon footprint, urban space usage and costs for companies are discussed.
LINK
Electrification of transportation, communication, working and living continues worldwide. Televisions, telephones, servers are an important part of everyday life. These loads and most sustainable sources as well, have one thing in common: Direct Current. The Dutch research and educational programme ‘DC – road to its full potential’ studies the impact of feeding these appliances from a DC grid. An improvement in energy efficiency is expected, other benefits are unknown and practical considerations are needed to come to a proper comparison with an AC grid. This paper starts with a brief introduction of the programme and its first stages. These stages encompass firstly the commissioning, selection and implementation of a safe and user friendly testing facility, to compare performance of domestic appliances when powered with AC and DC. Secondly, the relationship between the DC-testing facility and existing modeling and simulation assignments is explained. Thirdly, first results are discussed in a broad sense. An improved energy efficiency of 3% to 5% is already demonstrated for domestic appliances. That opens up questions for the performance of a domestic DC system as a whole. The paper then ends with proposed minor changes in the programme and guidelines for future projects. These changes encompass further studying of domestic appliances for product-development purposes, leaving less means for new and costly high-power testing facilities. Possible gains are 1) material and component savings 2) simpler and cheaper exteriors 3) stable and safe in-house infrastructure 4) whilst combined with local sustainable generation. That is the road ahead. 10.1109/DUE.2014.6827758
DOCUMENT