This Article presents the PSO matrix as a tool for making choices in change projects – choices for simplicity or for complexity. A good process structure is essential for a simple organization, but it is the employees and the managers who are expected to take the lead in the changes and the improvement proposals. The PSO matrix is a useful and usable instrument that promotes simplicity and respects the intelligence that is already present in the organization, particularly that of the ordinary employees. The approach leads to drastic savings. Do as much nothing as possible.
MULTIFILE
The Internet is changing the way we organize work. It is shifting the requirement for what we call the ‘schedule push’ and the hierarchical organization that it implies, and therefore it is removing the type of control that is conventionally used to match resources to tasks, and customer demand to supplies and services. Organizational hierarchies have become too expensive to sustain, and in many cases their style of coordination is simply no longer necessary. The cost complexity of the industrial complex starts to outweigh the benefits and the Internet is making it redundant.
MULTIFILE
Objectives: Current study explores the potential of the safety rating scale in order to determine the surplus value for evidence based practise. This study wants to contribute to this knowledge gape by exploring the safety scale by analysing the change between two safety ratings. First, the absolute change in safety is investigated. Secondly the study explores to what extent family background characteristics and case management characteristics determine the extent of change in perceived safety. Materials and Methods: The study analysed 105 Dutch child protection cases who had registration files with filled out LIRIK checklist, Action Plan and additional baseline safety and end safety measure as perceived by case managers. Results: On average perceived safety increased from an insufficient level to sufficient level. Significant regression coefficients with larger changes for primary school children (6 - 12 years) and lower changes for children within the ‘socio economic problems cluster’. The results reveal significant vulnerability for preschool children and families attending the socio-economic cluster due to limited improvement. Conclusion: According to this study the safety measure can be of value to outcome monitoring. The safety measure is a practical measure that reflects on the current state of safety within a family according to professionals and can be used on several occasions during case management. In addition, on aggregated level pre and post measures can be analysed for quality management purpose. Further exploration of this measure is needed. Publishers article: https://www.ecronicon.com/ecpe/ECPE-10-00873.php
DOCUMENT