With the approach of the zero emission zone implementation in 30-40 cities mandated by the Dutch Klimaatakkord, comes the need to determine whether the SMEs located within these zones are aware of the coming changes and if they are, how far they have come in their preparation. This paper delves into the development of the zero emission city logistics maturity model tool which is used to indicate the progress of these small to medium enterprises in light of reaching fully zero emission city logistics operations. The paper starts off with a review of existing maturity models which forms the baseline for the zero emission city logistics maturity model in rubric form. A QuickScan analysis is developed in order to facilitate data collection by students who then approach businesses and use the QuickScan results to benchmark the businesses progress against other businesses. This paper then concludes with the preliminary results from the initial QuickScans performed by HBO level students.
DOCUMENT
Abstract The Government of the Netherlands wants to be energy neutral by 2050 (Rijksoverheid, sd). A transition towards non-fossil energy sources also affects transport, which is one of the industries significantly contributing to CO2 emission (Centraal Bureau Statistiek, 2019). Road authorities at municipalities and provinces want a shift from fossil fuel-consuming to zero-emission transport choices by their inhabitants. For this the Province of Utrecht has data available. However, they struggle how to deploy data to positively influence inhabitants' mobility behavior. A problem analysis scoped the research and a survey revealed the gap between the province's current data-item approach that is infrastructure oriented and the required approach that adopts traveler’s personas to successfully stimulate cycling. For this more precisely defined captured data is needed and the focus should shift from already motivated cyclists to non-cyclers.
DOCUMENT
This paper examines how the transition management approach for sustainability transitions can be applied to the case of how Rotterdam established a zero-emission zone (ZEZ) for city logistics, aiming to stimulate the adoption of electric freight vehicles, enhance logistics efficiency and improve liveability. The study highlights the challenges and strategies involved in transitioning to a sustainable city logistics system. Through a case study methodology, the paper explores the development and implementation of Rotterdam's ZEZ, emphasising the importance of stakeholder collaboration, strategic planning, and continuous monitoring. The findings provide valuable insights into the practical application of transition management theory in city logistics, offering best practices for other cities aiming to achieve similar sustainability goals.
DOCUMENT
The transition from diesel-driven urban freight transport towards more electric urban freight transport turns out to be challenging in practice. A major concern for transport operators is how to find a reliable charging strategy for a larger electric vehicle fleet that provides flexibility based on different daily mission profiles within that fleet, while also minimizing costs. This contribution assesses the trade-off between a large battery pack and opportunity charging with regard to costs and operational constraints. Based on a case study with 39 electric freight vehicles that have been used by a parcel delivery company and a courier company in daily operations for over a year, various scenarios have been analyzed by means of a TCO analysis. Although a large battery allows for more flexibility in planning, opportunity charging can provide a feasible alternative, especially in the case of varying mission profiles. Additional personnel costs during opportunity charging can be avoided as much as possible by a well-integrated charging strategy, which can be realized by a reservation system that minimizes the risk of occupied charging stations and a dense network of charging stations.
MULTIFILE
From a circular standpoint it is interesting to reuse as much as possible construction and demolition waste (CDW) into new building projects. In most cases CDW will not be directly reusable and will need to be processed and stored first. In order to turn this into a successful business case CDW will need to be reused on a large scale. In this paper we present the concept of a centralized and coordinated location in the City of Utrecht where construction and demolition waste is collected, sorted, worked, stored for reuse, or shipped elsewhere for further processing in renewed materials. This has expected advantages for the amount of material reuse, financial advantages for firms and clients, generating employability in the logistics and processing of materials, optimizing the transport and distribution of materials through the city, and thus the reduction of emissions and congestion. In the paper we explore the local facility of a Circular Hub, and the potential effects on circular reuse, and other effects within the City of Utrecht.
DOCUMENT
The Dutch government, in alignment with the Paris climate agreement, has expressed the ambition to reduce CO 2 emissions in the Netherlands by 49% in 2030 compared to 1990. As freight transport is recognized as a serious CO 2 emitter, this sector is confronted with a substantial part of the target. For cities, the reduction of the urban freight transport emissions is, next to the CO 2 reduction, also important to improve the air quality. Dutch municipalities take an active role in coordination, facilitation and acceleration of the emission reduction processes, not only via regulation but also by using their public procurement power. This paper describes the City of Rotterdam's experiences from the EU Horizon 2020 BuyZET project. This project was launched in November 2016 and includes the cities of Rotterdam, Oslo and Copenhagen. The project aims at understanding and optimising the impact of public procurement activities on transport patterns and emissions in cities as well as to find innovative and sustainable delivery solutions for goods and services-related transport in order to reduce emissions.
MULTIFILE
Purpose Electric freight vehicles (EFVs) are one of the solutions to improve city logistics’ sustainability. EFVs, that are electric powered light and heavy vehicles with a number plate, have the potential to make zero emission city logistics possible within the urban area. However, although trials have been undertaken for the last years, large-scale usage of EFVs in city logistics does not occur yet. EFVs are technically possi- ble, but the implementation of EFVs in practice is relatively limited. Design This chapter examines by reviewing current and past EFV implementations, what are the challenges, barriers and success factors for EFVs in city logistics operations. EFVs have especially positive envir- onmental effects, but are overall usually more expensive (especially in procurement) than conventional vehicles. Besides, other technical and operational issues remain to be solved, and many uncertainties still exist on long-term usage. Findings Three main barriers for large-scale EFV uptake are identi- fied. The current logistics concepts are developed for conventional vehi- cles and should be redesigned to fit EFVs better. Local authorities’ support is essential in order to find a positive (or not too negative) business case. And EFV implementation requires companies that want to be sustainable. This contribution presents examples of how some companies or authorities deal with these barriers. Value This chapter concludes by identifying elements that are necessary for acceleration of EFV uptake in city logistics operations.
LINK
The project X-TEAM D2D (Extended ATM for Door-to-Door Travel) has been funded by SESAR JU in 2020 and completed its activities in 2022, pursuing and accomplishing the definition, development and initial assessment of a Concept of Operations (ConOps) for the seamless integration of ATM and air transport into an overall intermodal network, including other available transportation means (surface, water), to support the door-to-door connectivity, in up to 4 hours, between any location in Europe. The project addressed the ATM and air transport, including Urban Air Mobility (UAM), integration in the overall transport network serving urban and extended urban (up to regional level) mobility, specifically identifying and considering the transportation and passengers service scenarios expected for the near, medium and long-term future, i.e. for the project baseline (2025), intermediate (2035) and final (2050) time horizons. In this paper, the main outcomes from the project activities are summarized, with particular emphasis on the studies about the definition of future scenarios and use cases for the integration of the vertical transport with the surface transport towards integrated intermodal transport system and about identification of the barriers towards this goal. In addition, an outline is provided on the specific ConOps for the integration of ATM in intermodal transport infrastructure (i.e. the part of the overall ConOps devoted to integration of different transportation means) and on the specific ConOps for the integration of ATM in intermodal service to passengers (i.e. the specific component of the ConOps devoted to design of a unique service to passengers). Finally, the main outcomes are summarized from the validation of the proposed ConOps through dedicated simulations.
DOCUMENT
DOCUMENT
Developers of charging infrastructure, be it public or private parties, are highly dependent on accurate utilization data in order to make informed decisions where and when to expand charging points. The Amsterdam University of Applied Sciences, in close cooperation with the municipalities of Amsterdam, Rotterdam, The Hague, Utrecht, and the Metropolitan Region of Amsterdam Electric, developed both the back- and front-end of a charging infrastructure assessment platform that processes and represents real-life charging data. Charging infrastructure planning and design methods described in the literature use geographic information system data, traffic flow data of non-EV vehicles, or geographical distributions of, for example, refueling stations for combustion engine vehicles. Only limited methods apply real-life charging data. Rolling out public charging infrastructure is a balancing act between stimulating the transition to zero-emission transport by enabling (candidate) EV drivers to charge, and limiting costly investments in public charging infrastructure. Five key performance indicators for charging infrastructure utilization are derived from literature, workshops, and discussions with practitioners. The paper describes the Data Warehouse architecture designed for processing large amounts of charging data, and the web-based assessment platform by which practitioners get access to relevant knowledge and information about the current performance of existing charging infrastructure represented by the key performance indicators developed. The platform allows stakeholders in the decision-making process of charging point installation to make informed decisions on where and how to expand the already existing charging infrastructure. The results are generalizable beyond the case study regions in the Netherlands and can serve the roll-out of charging infrastructure, both public and semi-public, all over the world.
DOCUMENT