This paper aims to develop a tool for measuring the clients’ maturity in smart maintenance supply networks. The assessment tool is developed and validated for corporate facilities management organizations using case studies and expert consultation. Based on application of the assessment tool in five cases, conclusions are presented about the levels of maturity found and the strengths and limitations of the assessment tool itself. Also, implications for further research are proposed.
DOCUMENT
This paper aims to develop a tool for measuring the clients’ maturity in smart maintenance supply networks. The assessment tool is developed and validated for corporate facilities management organizations using case studies and expert consultation. Based on application of the assessment tool in five cases, conclusions are presented about the levels of maturity found and the strengths and limitations of the assessment tool itself. Also, implications for further research are proposed.
MULTIFILE
From the article: "Project execution in the construction industry faces major challenges, e.g. difficulty in coordination and cooperation. Operational procurement during project execution is no exception. In this paper we construct a maturity model, based on earlier work, consisting of six dimensions (goal, control, process, organization, information, technology) and five maturity stages (transactional-oriented, commercial-oriented, coordination, internal-optimized, external-optimized). The model can be used to determine the level of procurement maturity for each of the dimensions, and for the determination of a strategy for growth in the construction industry. With input from a major construction firm in the Netherlands, through simulating tooling, the model is evaluated for its contribution to growth in operational excellence. Results of the simulation show support for a relation between maturity growth and increased operational excellence." Recommended Citation Xing, Xiaochun; Versendaal, Johan; van den Akker, Marjan; and De Bevere, Bastiaan, "Maturity of Operational Procurement in the Construction Industry: A Business/IT-Alignment Perspective" (2011). BLED 2011 Proceedings. Paper 22. http://aisel.aisnet.org/bled2011/22 Affiliation: Xing Xiaochun - Swets Information Services, Netherlands; Johan Versendaal - Utrecht University, Netherlands; HU University of Applied Sciences, Netherlands; Marjan van den Akker - Utrecht University, Netherlands; Bastiaan De Bevere - Ballast Nedam, Netherlands.
MULTIFILE