From the article: The ‘Axiomatic Design Methodology’ uses ‘Axioms’ that cannot be proven nor derived from physical phenomena. The axioms serve as guidelines for the design process of products and systems. The latest contribution was the addition of the ‘Complexity Axiom’ in 1999. However, the underlying theory of complexity did not get much traction by designers and their managers yet. It emphasises difficulties in the design, not primarily focussing on solutions. The ‘Theory of Complexity’ is converted to a ‘Theory of Maturity’ in this paper. It is supported with a graphical way to plot maturity as it develops. It visualises the results in a way that can be understood by all entities in a company, engineers, managers, and executives. Understanding the maturity of a system enables selection of the right measures to control it. Visualisation enables communication between the interacting parties. If successful development trajectories are understood, eventually from earlier experience, even better corrective actions can be applied. The method appears an affirmative way to graphically represent progression in design, thus presenting advances in a positive context. Though positively presented, it is not the case that the method hides problems; presumed and legitimate project progression can be quite different, which challenges the designer to understand the process. In this way, the method sends out a continuous warning to stay critical on design choices made.
DOCUMENT
From the article: "Project execution in the construction industry faces major challenges, e.g. difficulty in coordination and cooperation. Operational procurement during project execution is no exception. In this paper we construct a maturity model, based on earlier work, consisting of six dimensions (goal, control, process, organization, information, technology) and five maturity stages (transactional-oriented, commercial-oriented, coordination, internal-optimized, external-optimized). The model can be used to determine the level of procurement maturity for each of the dimensions, and for the determination of a strategy for growth in the construction industry. With input from a major construction firm in the Netherlands, through simulating tooling, the model is evaluated for its contribution to growth in operational excellence. Results of the simulation show support for a relation between maturity growth and increased operational excellence." Recommended Citation Xing, Xiaochun; Versendaal, Johan; van den Akker, Marjan; and De Bevere, Bastiaan, "Maturity of Operational Procurement in the Construction Industry: A Business/IT-Alignment Perspective" (2011). BLED 2011 Proceedings. Paper 22. http://aisel.aisnet.org/bled2011/22 Affiliation: Xing Xiaochun - Swets Information Services, Netherlands; Johan Versendaal - Utrecht University, Netherlands; HU University of Applied Sciences, Netherlands; Marjan van den Akker - Utrecht University, Netherlands; Bastiaan De Bevere - Ballast Nedam, Netherlands.
MULTIFILE
During recent years the world has seen rapid changes such as globalization, the Internet, and the rise of new economies. To survive these changes organizations need to be in control of their processes, and be able to continuously improve the process performance. Therefore many organizations are increasingly adopting Business Process Management (BPM). However, it is not clear if the implementation of BPM(S) is really adding value to an organization. Consequently, in this paper, we try to answer the following research question: 'Does adoption of Business Process Management lead to a higher process performance?' Based on quantitative research we show that there is dependence between the performance of processes within an organization and the BPM maturity of that organization. As a result we conclude that improvement in process performance can be attained by increasing the BPM maturity of an organization.
DOCUMENT