The lack of in-depth understanding of the seismic behavior and ductility of precast concrete structures makes it difficult to reach to ductility demand which could be exhibited during an earthquake. The limitations are mainly related to the beam-to-column connections as the main load transfer paths. Two distinct exterior beam-column connections made of normal-strength concrete are investigated experimentally. Both dry and wet type installment techniques are used in the industrial type joints while the residential type joints are wet connections. The specimens are subjected cyclic displacement reversals in order to obtain information on strength, stiffness and ductility characteristics of the connection details. The preliminary design of the joints has been updated during the tests based on the damages observed, thus a set of improved specimens have also been built and tested, and a relatively better performance is obtained expectedly. The industrial and residential types of connections showed stable load-displacement cycles with high energy dissipation up to structural drift of 2%, though a significant level of pinching and deterioration of the critical section have occurred at around 3% drift level. The tested specimens have been numerically modeled to calibrate the analytical tools, and a satisfactory approximation has been obtained between experimental and numerical results.
LINK
In this work, in situ measurements of the radio frequency electromagnetic field exposure have been conducted for an indoor massive MIMO 5G base station operating at 26–28 GHz. Measurements were performed at six different positions (at distances between 9.94 and 14.32 m from the base station), of which four were in line-of-sight and two were in non-line-of-sight. A comparison was performed between the measurements conducted with an omnidirectional probe and with a horn antenna, for scenarios with and without a user equipment used to actively create an antenna traffic beam from the base station towards the measurement location. A maximum exposure of 171.9 mW/m2 was measured at a distance of 9.94 m from the base station. This is below 2% of the ICNIRP reference level. Moreover, the feasibility to measure the power per resource element of the Synchronization Signal Block - which can be used to extrapolate the maximum exposure level - with a conventional spectrum analyzer was shown by comparison with a network decoder.
MULTIFILE
The Maritime Spatial Planning (MSP) Challenge simulation platform helps planners and stakeholders understand and manage the complexity of MSP. In the interactive simulation, different data layers covering an entire sea region can be viewed to make an assessment of the current status. Users can create scenarios for future uses of the marine space over a period of several decades. Changes in energy infrastructure, shipping, and the marine environment are then simulated, and the effects are visualized using indicators and heat maps. The platform is built with advanced game technology and uses aspects of role-play to create interactive sessions; it can thus be referred to as serious gaming. To calculate and visualize the effects of planning decisions on the marine ecology, we integrated the Ecopath with Ecosim (EwE) food web modeling approach into the platform. We demonstrate how EwE was connected to MSP, considering the range of constraints imposed by running scientific software in interactive serious gaming sessions while still providing cascading ecological feedback in response to planning actions. We explored the connection by adapting two published ecological models for use in MSP sessions. We conclude with lessons learned and identify future developments of the simulation platform.
MULTIFILE