People tend to use the same door every time they enter and exit a building. When certainentrances are widely preferred over others, congestion can occur. This paper describes twointerventions to persuade visitors to use another entrance. The first intervention used sensory deprivation (darkness), and the second used guidance paths. The first intervention on sensory deprivation had the expected outcome. This intervention resulted in an avoidance of the darkened door. The second intervention had a result contrary to the expectations; it resulted in an increased preference for the door without guidance paths.
MULTIFILE
Public lighting’s primary purpose is nighttime visibility for security and safety. How to meet so many requirements of so many stakeholders? The key to developing a good plan is to relate lighting to functions of public spaces, because street lighting is more than a technical requirement, a security need, or a design element. It can be thought of and utilized in terms of how the type, placement, and wattage affect how a street is perceived and used. With present-day used street lighting systems however, flexibility is expensive, as is maintenance and energy consumption. A new solution is to use LED lighting with a Direct Current power system. Advantages are a decrease in: energy conversions; material use; amount of switch- boxes; components; labour costs and environmental comfort. The overall implementation of LED and DC will result in better control and efficient maintenance due to integrated bidirectional communication. A challenge is the relatively high investment for these new solutions. Another challenge; DC is not a standard yet in rules and regulations. In the paper the transition to direct current public lighting system will be described with all the pros and cons. A new concept of public ownership, to overcome financial challenges will be discussed. M Hulsebosch1, P Willigenburg2 ,J Woudstra2 and B Groenewald3 1CityTec b.v., Alblasserdam, The Netherlands 2The Hague University of Applied Sciences, The Hague, The Netherlands 3Cape Peninsula University of Technology, Cape Town, South Africa 10.1109/ICUE.2014.6904186
The design and realization of a healthy indoor environment is a challenge that is investigated from different perspectives at the unit Building Physics and Systems (BPS; Faculty of Architecture, Building and Planning) of Eindhoven University of Technology. Performance requirements (for instance, with respect to air quality, thermal comfort and lighting) and performance based assessment methods are the point-of-departure, focusing at computational techniques supporting the design process. Different specific application fields such as dwellings, offices, schools, but also, operating theatres, churches, musea and multifunctional stadiums, underline the applied approach that is part of the research within the unit. In the design of healthy environments, the performance based design assessment is crucial in arriving at innovative design solutions and optimized indoor and outdoor environments. In this assessment computational support tools and experimental verification play an important role. However, assessing the right indicators in an objective way, applying the correct tools and correct application of these tools is not yet well established. Alongside, developments are still ongoing. The work performed in the unit by the different researchers relates to the research questions that can be derived from this notice. The paper gives an introduction to the Unit BPS and presents a brief overview of recent and ongoing research. An extensive list of references is provided for further reading and supports the conclusion that healthy environments can and should be addressed from a wide angle.
LINK
In summer 2020, part of a quay wall in Amsterdam collapsed, and in 2010, construction for a parking lot in Amsterdam was hindered by old sewage lines. New sustainable electric systems are being built on top of the foundations of old windmills, in places where industry thrived in the 19th century. All these examples have one point in common: They involve largely unknown and invisible historic underground structures in a densely built historic city. We argue that truly circular building practices in old cities require smart interfaces that allow the circular use of data from the past when planning the future. The continuous use and reuse of the same plots of land stands in stark contrast with the discontinuity and dispersed nature of project-oriented information. Construction and data technology improves, but information about the past is incomplete. We have to break through the lack of historic continuity of data to make building practices truly circular. Future-oriented construction in Amsterdam requires historic knowledge and continuous documentation of interventions and findings over time. A web portal will bring together a range of diverse public and private, professional and citizen stakeholders, each with their own interests and needs. Two creative industry stakeholders, Yume interactive (Yume) and publisher NAI010, come together to work with a major engineering office (Witteveen+Bos), the AMS Institute, the office of Engineering of the Municipality of Amsterdam, UNESCO NL and two faculties of Delft University of Technology (Architecture and Computer Science) to inventorize historic datasets on the Amsterdam underground. The team will connect all the relevant stakeholders to develop a pilot methodology and a web portal connecting historic data sets for use in contemporary and future design. A book publication will document the process and outcomes, highlighting the need for circular practices that tie past, present and future.