From a circular standpoint it is interesting to reuse as much as possible construction and demolition waste (CDW) into new building projects. In most cases CDW will not be directly reusable and will need to be processed and stored first. In order to turn this into a successful business case CDW will need to be reused on a large scale. In this paper we present the concept of a centralized and coordinated location in the City of Utrecht where construction and demolition waste is collected, sorted, worked, stored for reuse, or shipped elsewhere for further processing in renewed materials. This has expected advantages for the amount of material reuse, financial advantages for firms and clients, generating employability in the logistics and processing of materials, optimizing the transport and distribution of materials through the city, and thus the reduction of emissions and congestion. In the paper we explore the local facility of a Circular Hub, and the potential effects on circular reuse, and other effects within the City of Utrecht.
DOCUMENT
DOCUMENT
MULTIFILE
Dealing with and maintaining high-quality standards in the design and construction phases is challenging, especially for on-site construction. Issues like improper implementation of building components and poor communication can widen the gap between design specifications and actual conditions. To prevent this, particularly for energy-efficient buildings, it is vital to develop resilient, sustainable strategies. These should optimize resource use, minimize environmental impact, and enhance livability, contributing to carbon neutrality by 2050 and climate change mitigation. Traditional post-occupancy evaluations, which identify defects after construction, are impractical for addressing energy performance gaps. A new, real-time inspection approach is necessary throughout the construction process. This paper suggests an innovative guideline for prefabricated buildings, emphasizing digital ‘self-instruction’ and ‘self-inspection’. These procedures ensure activities impacting quality adhere to specific instructions, drawings, and 3D models, incorporating the relevant acceptance criteria to verify completion. This methodology, promoting alignment with planned energy-efficient features, is supported by BIM-based software and Augmented Reality (AR) tools, embodying Industry 4.0 principles. BIM (Building Information Modeling) and AR bridge the gap between virtual design and actual construction, improving stakeholder communication and enabling real-time monitoring and adjustments. This integration fosters accuracy and efficiency, which are key for energy-efficient and nearly zero-energy buildings, marking a shift towards a more precise, collaborative, and environmentally sensible construction industry.
DOCUMENT
The Utrecht SBE16 Conference. From the introduction: "The conference is part of the Sustainable Built conference series and is as such considered to be part of the pre-eminent international conference series on sustainable building and construction endorsed by iiSBE, UNEP-SBO and FIDIC. The Utrecht SBE16 conference is hosted by the Centre of Expertise Smart Sustainable Cities of HU University of Applied Sciences Utrecht, in partnership with six Dutch Universities of Applied Sciences (Avans, Saxion, Rotterdam, The Hague, Zuyd, InHolland) and the Utrecht Sustainability Institute (USI). The Transition Zero conference provides us with a unique opportunity to meet transition professionals in urban sustainability from all over Europe and beyond and to learn about the latest developments and best (inter)national practices in urban sustainability. The rich interest in the conference, made it possible to offer research as well as practitioner-driven tracks on topics related to the conference title. The conference brought together excellent future-minded practitioners, researchers and thought leaders from the R&I community, specialists and professionals on zero energy homes and transition of the built environment."
DOCUMENT
Introduction to the conference
DOCUMENT