A series of tests performed on as-built and strengthened timber joist-masonry-wall specimens. The test aims at providing a complete characterization of the behaviour of the timber-joist connections under axial cyclic loading. The obtained results will be used as inputs to calibrate numerical models to simulate the connection between the cavity wall and timber joist.
The pipelines are buried structures. They move together with the soil during a seismic event. They are affected from ground motions. The project aims to find out the possible effects of Groningen earthquakes on pipelines of Loppersum and Slochteren.This project is devised for conducting an initial probe on the available data to see the possible actions that can be taken, initially on these two pilot villages, Loppersum and Slochteren, for detecting the potential relationship between the past damages and the seismic activity.Lifeline infrastructure, such as water mains and sewerage systems, covering our urbanised areas like a network, are most of the times, sensitive to seismic actions. This sensitivity can be in the form of extended damage during seismic events, or other collateral damages, such as what happened in Christchurch Earthquakes in 2011 in New Zealand when the sewerage system of the city was filled in with tonnes of sand due to liquefaction.Regular damage detection is one of key solutions for operational purposes. The earthquake mitigation, however, needs large scale risk studies with expected spatial distribution of damages for varying seismic hazard levels.
Krewerd is a small village in the North-East side of the Groningen Gas Field. It has 45 houses in total, 2 of which are included in the P50 risk zone and will therefore be assessed by National Coordinator Groningen (NCG). The rest of the houses are not in the priority list and will not be evaluated within 3 years, according to the existing plans of September 2019. It has been made clear by NCG that the usual engineering process, that includes all sorts of engineering calculations and procedures per NPR9998, cannot be followed in Krewerd. This is because the available engineering capacity is being used by NCG at its maximum, for the prior aim of accelerating the assessment and strengthening works in the P50 region. This project is prepared for presentation to NCG as an experimental project at Krewerd and is based on an initial document prepared by Fons Verheijen , a supportive document prepared by Otto Wassenaar , as well as the recent meeting by the two and Ihsan Engin Bal from Hanze. Furthermore, considering that the NCG is seeking an acceleration of the assessment procedure, the village Krewerd may play a role as a pilot.